01
Instrument
6 weeks
Lynx sub-meters installed without stopping production.
Your cost: €0
Economy +
Ecology.
ENERGY SAVINGS AS A SERVICE
We measure, identify savings opportunities and drive the actions. We are only paid on the savings you actually achieve, verified by an IPMVP model validated by a certification body.


IPMVP protocol
Model validated by a certification body
€0 CAPEX
No investment for the installation of the metering systems, the EMS software and the associated energy efficiency services.
IPMVP
Savings are modelled according to the IPMVP protocol, validated by a certification body.
3 YEARS MAXIMUM
After 3 years of sharing the savings achieved, you own the metering equipment and 100% of the savings are yours.
HARDWARE
The systems become your property at the end of the contract.
OUR METHOD

01
6 weeks
Lynx sub-meters installed without stopping production.
Your cost: €0

02
8 weeks
Initial report and costed action plan on Wattseeker.
Your cost: €0

03
3 years
Savings verified every quarter under IPMVP, then shared.
You only pay on what you have saved
Purchase order · contractual starting point
T1 + 6 weeks · installation and commissioning
T2 + 8 weeks · delivery of the initial report
T3 + 2 weeks · action plan review, energy savings sharing begins
WHAT YOU KEEP
We fund the metering and the support. After three years, 100% of the savings and the equipment are yours.
Year 1
Year 2
Year 3
Year 4 and beyond
Beyond 8% savings achieved, all additional gains go to you in full.
Two or three years from the action plan review meeting. No automatic renewal.
Example
An annual bill of €1.5M at a reference price of €100/MWh. At 5% savings, that is €75,000 a year:
Illustrative example based on the reference site in the contract. Your figures depend on your consumption profile and your purchase prices.

WHO IT IS FOR
We only sign after a free feasibility study carried out by our team.
Energy bill above €500k/year
Usable consumption history
A designated internal lead
Actions implemented within a month
IPMVP
We compare your actual consumption with an adjusted baseline, following the international IPMVP protocol.
Savings (kWh)
Adjusted baseline consumption−Measured consumption
Savings (€)
Savings (kWh)×Fixed reference price

IPMVP protocol — Model validated by a certification body